Team

Team Categories and specializations

Engineering

  • Electrical Engineering
  • Hardware System Engineer
    • Hardware Architect
      • Specifies hardware components (i.e SoC, Audio Codec, Wifi/BT Chipsets etc.)
  • Hardware System Integration Engineer
    • Hardware Design
      • Schematic Capture
      • PCB Layout
        • Component placement & routing
  • Hardware RF System Engineer
    • Hardware Design
      • Schematic Capture
      • PCB Layout
        • Component placement & routing
  • Hardware System Validation Engineer
    • Execute overall System Test
      • Test Plan
      • Test Execution
  • Antenna Engineer
    • Design Antennas for different RF Systems
      • WIFI/BT
      • Cellular
  • Power System Engineer
    • Power System Design
      • Battery Capacity
      • Battery Charger (i.e battery powered device)
      • Power Supplier Unit (PSU)( i.e wall adaptor)
    • Component Engineer
      • Component Selection
        • Verify Component Characteristics
        • Verify EOL of components
  • PCB Layout Engineer
    • PCB Design
      • Stackup
      • Placement
      • Routing
      • Design Files
        • Gerber/ODB++ files
        • Assembly Drawing
  • Mechanical Engineering
    • Product Design Engineer
      • Enclosure Design
        • Overall form factor design
      • Module Design
        • Camera module
        • Display module
        • USB module
        • Flexies
    • Reliability Engineer
        • drop test, waterproof test, tumble test, thermal shock test, thermal cycling test, long term stress test, etc.
  • Software
    • Embedded System
    • Familiar with ROTS and C/C++ Language
      • Standalone Sensor Hub for sensor readings
      • Embedded Controller for power on/off sequencing
    • Kernel
      • Bootloader
        • DTS/DTB
        • Secure Boot
      • Drivers
        • I/O Peripherals
          • WIFI
          • Audio
          • Display
          • Sensors
    • Platform (OS)
      • I.e Android

Program Management

  • System Technical Program Manager
    • Overall Program Schedule
    • Specify Built Plans
      • Proto->EVT->DVT->PVT->MP
        • Dates
        • Quantity of each build
  • Technical Program Manager
    • Arrange crossfuntional Meetings
      • Drive Built Schedule
      • Sendout Layout reviews
      • Sendout Schematic reviews
      • Drive material in house schedule
        • Deliver BOM to Manufacturer